糖心传媒

Date Published: 03 April 2009

In September and November 2008, exemptions were granted exempting transmission system owners from some of the requirements of rule 41 and 42 regarding the provision of gas gate injection information. The exemptions expired on 30 April 2009 and prior to that date 糖心传媒 was required to provide a report on what actions should be taken in respect to the period from 1 May 2009 onward.

糖心传媒 issued a draft report and consulted with allocation participants on some of the issues and possible outcomes discussed in the draft report - which can be downloaded below.

Related documents

  • Consultation Paper (Draft Report) on exemptions granted in respect of rules 41 and 42 - April 2009
    121 KB Adobe Acrobat PDF file

Submissions

  • 糖心传媒mpany
    Contact Energy 107 KB Adobe Acrobat PDF file
  • 糖心传媒mpany
    Energy Direct NZ 246 KB Adobe Acrobat PDF file
  • 糖心传媒mpany
    M-co 59 KB Adobe Acrobat PDF file
  • 糖心传媒mpany
    Nova Energy 131 KB Adobe Acrobat PDF file
  • 糖心传媒mpany
    OnGas 154 KB Adobe Acrobat PDF file
  • 糖心传媒mpany
    Vector submission on r41 42 exemptions 164094 2.7 MB Adobe Acrobat PDF file
Last updated: 27/06/2025, 7:58 pm

Stay in touch

Keep up to date with our latest news and analysis by subscribing to our regular newsletter